Manufacturing execution system

Every machine.
Every shot.
One console.

PlantNex shows the shop floor as it happens — live OEE, breakdowns with their reasons, quality and material traceability — and hands clean figures to your ERP. Built for injection moulding and discrete plants, from five machines to many plants.

  • LIVE OEE
  • BREAKDOWNS & ANDON
  • QUALITY & SPC
  • TRACEABILITY
  • MOULD MAINTENANCE
  • SAP / ERP
Why PlantNex

The shift report should not be the first time you see the shift.

Most plants still learn what happened on the floor hours later — from paper sheets, a spreadsheet and memory. PlantNex records it while it happens, at the machine, and turns it into figures everyone trusts: operators, the shift leader, quality, maintenance and the plant manager.

OEE? We work it out at month end.

Figures typed in from paper, too late to act on.

It stopped — nobody knows why.

Stops without reasons, the same loss every week.

Which lot went to the customer?

Traceability rebuilt by hand when a complaint comes.

The mould was due for service.

Maintenance by memory, not by shot count.

We type it all into SAP again.

Confirmations entered twice, numbers that never match.

What changes on day one

One truth, from the machine to the batch record.

01

Live OEE, per machine and shift

Shots counted from the machine, target against actual by the hour, availability, performance and quality with their losses and their cost.

02

Every stop with a reason

Breakdowns detected automatically, the reason chosen at the machine in three taps, short stops and planned downtime kept apart.

03

A console made for operators

A touch-first Shopfloor Console in four layouts, badge log-on, scrap booking, and help calls that reach the right person — Andon included.

04

Quality built into the flow

Inspections, gauges, SPC, AQL sampling, 8D quality cases and batch records with signatures — checks that stop a wrong start.

05

Material and lot traceability

From the supplier's batch to the finished lot and the customer's delivery; the wrong material refused at the machine; labels printed when packing.

06

Moulds and machines looked after

Maintenance due by shots or by time; a due blocking task stops the mould being loaded; where each mould is and what was repaired.

How it fits — ISA-95 aligned

Between your machines and your ERP.

PlantNex is the shop-floor layer: it reads the machines, runs the orders, and gives the ERP back what really happened.

MACHINESLEVEL 1–2
  • OPC UA and MQTT, built in
  • Node-RED edge
  • Shot counter, status, energy, setpoints
PLANTNEX MESLEVEL 3 · THE SHOP FLOOR
  • Orders, queue, setup, shifts
  • OEE, losses, breakdowns, Andon
  • Quality, traceability, maintenance
BUSINESSLEVEL 4
  • SAP S/4HANA or any ERP
  • Orders in, confirmations out
  • Power BI and scheduled reports

No ERP yet? PlantNex runs on its own: orders written in PlantNex, master data imported from Excel — connect an ERP when you are ready.

Built for the plant floor

On your server. In your language. Running in an hour.

1 server

Runs in your plant

On-premise. A small plant runs on 4 vCPU, 8 GB RAM and 100 GB SSD. Your data stays in your building.

~1 hour

To install

One command sets up the database, secrets, certificates and backups. No database administrator needed.

Offline

Keeps working

Operators keep booking when the network drops; it is sent when the connection is back.

Audit

Every change on record

Who, when and why for every change, signatures on batch records, roles and permissions per page.

Safe

Backups & upgrades

Encrypted, verified backups. Upgrades check, back up, migrate and roll back by themselves.

EN · DE · CS

In your language

English, German and Czech, your plant's time zone, moulding or general-manufacturing wording.

01

Walk the floor

One day on site: your machines, your losses, what to measure first.

02

Pilot on 3–5 machines

A 30-day trial key — live OEE and breakdown reasons from week one.

03

Roll out

All machines, then the modules your plant needs: quality, traceability, ERP.

See your own shop floor live, in 30 days.